← Resources

Background

Why interface management matters

Industry research into large capital projects points to the same conclusion again and again: the boundaries between scopes are where projects are won or lost.

Studies of megaproject performance consistently find that a large share of cost and schedule overruns originate at interfaces — the handoffs between contractors, disciplines and systems — rather than within any single scope of work.

The common threads

  • Problems at interfaces tend to surface late, when they are most expensive to resolve.
  • Poor communication across organisational boundaries is a leading root cause of rework.
  • Projects with a formal, transparent interface process report fewer surprises during construction and commissioning.

The takeaway

Managing interfaces deliberately — with clear ownership, an agreed workflow and visible reporting — is one of the highest-leverage things a project can do. A shared system makes that practical at scale.

See how our interface management system puts this into practice, or start with the procedure template.

Want to see interface management in action?

We’ll walk you through our system on your project.

Request a demo